Every risk assessment answers the same three questions: what can go wrong, how likely is it, and how bad would it be. ISO 31000 calls the process risk identification, risk analysis and risk evaluation. What differs between methods is how the answer is expressed (words, scores or money), what the analysis starts from (assets, threats, vulnerabilities, consequences or process hazards) and how deep it goes (a high-level screen or a detailed assessment). Choosing well matters: the same risk can be engineered from a matrix and budgeted in money, but the two numbers answer different questions.
1. By how risk is expressed
Qualitative risk assessment
Likelihood and consequence are described in words on defined scales, for example likelihood Rare, Unlikely, Possible, Likely, Almost certain and impact Minor ... Critical. A matrix combines the two words into a risk level such as Low, Moderate or High.
- Strengths: fast, needs no data, easy to explain in a workshop, good for screening many risks.
- Weaknesses: subjective and coarse; two assessors can read "Likely" differently; risks in the same cell cannot be told apart.
- Typical use: early screening, small organisations, the first pass of an assessment.
Semi-quantitative risk assessment
The scales get numbers, usually 1 to 5, and the numbers are combined, most often by multiplication: likelihood 4 x impact 5 = 20, which falls in the band High. Many methods add weighting factors such as exposure, exploitability or attacker capability. NIST SP 800-30 Rev. 1 describes this as semi-quantitative assessment and gives scales such as 0-10 or 0-100 next to the words Very Low ... Very High.
- Strengths: consistent and repeatable ranking across hundreds of risks; easy to audit; supports thresholds such as a tolerable risk.
- Weaknesses: the numbers are ordinal: they order risks but are not quantities. A score of 20 is not twice as much risk as 10, and averaging or adding scores has no meaning. Matrices also suffer from range compression (very different risks share a cell) and, at the edges, can even rank a smaller risk above a larger one (Cox, 2008).
- Typical use: engineering assessments, IEC 62443-3-2, most enterprise risk registers.
Quantitative risk assessment
Risk is expressed in measurable units: how many loss events are expected per year and what one event costs. The classic formula is
ALE = SLE x ARO
annual loss expectancy = single loss expectancy x annual rate of occurrence.
Example: a ransomware outage costing 2,000,000 expected once in five years (ARO 0.2) gives an ALE of 400,000 a year.
Modern quantitative methods replace the single guesses with ranges (minimum, most likely, maximum) and run a Monte Carlo simulation: thousands of possible years are drawn, each with a random number of events and a random loss per event. The result is a distribution, read as the mean (ALE), percentiles such as P90 ("nine years in ten the loss is below this"), the chance of any loss in a year, and a loss exceedance curve (the probability that the yearly loss exceeds each amount).
- Strengths: answers money questions directly: what a risk costs, what a control is worth, whether a control pays for itself, how much insurance cover makes sense. Results can be added across risks (means only) and compared with other business risks.
- Weaknesses: needs data or calibrated estimates and more effort per risk; OT incident data is thin, so precise-looking numbers can create false confidence. Always show the range and the basis.
- Typical use: the top risks, business cases for controls, cyber insurance, board and CFO reporting.
FAIR in brief
Factor Analysis of Information Risk (Open FAIR, The Open Group O-RT and O-RA) is the most widely used quantitative cyber risk model. It breaks risk into factors that can each be estimated:
- Risk = loss event frequency (LEF) x loss magnitude (LM).
- Loss event frequency = threat event frequency x vulnerability (the probability that a threat event becomes a loss event); threat event frequency comes from contact frequency x probability of action.
- Loss magnitude = primary loss (productivity, response, replacement) + secondary loss (fines and judgements, reputation, competitive advantage), the secondary part occurring only with some probability.
Each factor is estimated as a range, usually with a PERT distribution, and simulated. Calibrated estimation (Hubbard and Seiersen, How to Measure Anything in Cybersecurity Risk) trains experts to give ranges that are right as often as they claim.
Return on security investment
With a quantitative view, a control can be judged by the loss it avoids: ROSI = (ALE before - ALE after - annual cost of the control) / annual cost of the control. A control that costs 150,000 a year and cuts the ALE from 1,200,000 to 300,000 returns (900,000 - 150,000) / 150,000 = 500%. A negative ROSI does not mean the control is unnecessary: safety, regulation or the SL-T may still require it.
| Qualitative | Semi-quantitative | Quantitative | |
|---|---|---|---|
| Risk expressed as | Words (Low ... Critical) | Scores on ordinal scales, combined (e.g. 1-25) and banded | Money and frequency: ALE, P90, loss exceedance |
| Inputs | Expert judgement | Expert judgement on defined scales and factors | Ranges for frequency and loss from data or calibrated experts |
| Effort per risk | Low | Low to medium | Medium to high |
| Best for | Screening, workshops | Consistent ranking, thresholds, engineering (SL-T) | Cost-benefit, budgets, insurance, board |
| Main pitfall | Subjectivity | Treating ordinal scores as quantities | False precision from thin data |
| References | ISO 31010, ISO/IEC 27005 | NIST SP 800-30, IEC 62443-3-2 practice | Open FAIR, ISO/IEC 27005, NIST IR 8286 |
2. By what the analysis starts from
Asset-based
Start from the inventory: for each asset, which threats and vulnerabilities apply and what its loss would mean for confidentiality, integrity and availability. Thorough and auditable, the traditional ISO/IEC 27005 approach, but it can miss risks that only appear when several assets fail together.
Threat- or scenario-based
Start from how an attack would unfold: threat actor, entry point, path through the network, technique (for example MITRE ATT&CK for ICS) and consequence. Fewer, richer risks that describe real attack paths and map naturally to zones and conduits. Event-based assessment in ISO/IEC 27005:2022 and the detailed assessment of IEC 62443-3-2 (ZCR 5) work this way.
Vulnerability-based
Start from known weaknesses, such as scan findings, CVEs with CVSS, EPSS and the CISA KEV list, and rate the risk each one creates in its context. Good for operations and patch prioritisation; on its own it misses design weaknesses and insider or supply-chain scenarios.
Consequence-based
Start from the worst outcomes the business cannot accept and work backwards to the digital paths that could cause them. Idaho National Laboratory's Consequence-driven Cyber-informed Engineering (CCE) is the best-known method: it focuses engineering effort on a handful of high-consequence events and favours engineered, non-digital protections.
Process-hazard-based: Cyber-PHA, LOPA and bow-tie
- Cyber-PHA (ISA TR84.00.09, IEC 62443-3-2 ZCR 5) takes the plant's HAZOP nodes and asks which deviations a cyber attack could cause, which safeguards could be defeated digitally and which cannot (relief valves, mechanical trips). The non-hackable safeguards limit the consequence that the cyber risk carries.
- LOPA (layers of protection analysis, IEC 61511) is a semi-quantitative safety method: initiating event frequency x the probability of failure on demand of each independent protection layer, compared with a tolerable frequency. Cyber attacks matter because they can defeat several layers at once, breaking the independence LOPA relies on.
- Bow-tie shows threats on the left, the top event in the middle and consequences on the right, with preventive barriers before and mitigating barriers after the event. It is an excellent communication tool for operators and management.
3. By depth and timing
- High-level (initial) assessment: a fast screen of the whole system under consideration to find what needs attention, as in IEC 62443-3-2 ZCR 2, before zones and conduits are defined.
- Detailed assessment: per zone and conduit, scenario by scenario, with countermeasures and residual risk, as in IEC 62443-3-2 ZCR 5.
- Design-time vs operational: a design assessment sets the target (SL-T, requirements); an operational assessment rechecks the real system after change, incidents and new vulnerabilities (IEC 62443-2-1, ISO/IEC 27001 clause 8.2).
4. Where IEC 62443 fits
IEC 62443-3-2 does not prescribe a method: the asset owner's risk matrix and tolerable risk are used. In practice almost every OT project uses a semi-quantitative matrix, because the standard's next step needs a consistent number: the cyber risk reduction factor, CRRF = unmitigated risk / tolerable risk, which sets the security level target (SL-T) of each zone and conduit. A money figure would make the design swing with every cost estimate, so the matrix should keep driving the engineering. The quantitative view belongs beside it: to show what the treatment is worth and to answer the budget, insurance and board questions.
5. Which method for which decision
| Decision | Method that fits |
|---|---|
| Screen a new system quickly | Qualitative or high-level semi-quantitative (ZCR 2) |
| Set zones, conduits and SL-T | Semi-quantitative matrix with tolerable risk and CRRF |
| Plan countermeasures against real attack paths | Scenario-based detailed assessment (ZCR 5), ATT&CK for ICS |
| Find cyber causes of process hazards | Cyber-PHA on the HAZOP; LOPA where safety layers are counted |
| Prioritise patches and findings | Vulnerability-based with KEV and EPSS in context |
| Justify a budget, choose between controls, buy insurance | Quantitative (FAIR-style ALE, P90, ROSI) for the top risks |
| Protect against unacceptable outcomes | Consequence-based (CCE) with engineered safeguards |
6. Common mistakes
- Doing arithmetic on ordinal scores: averaging, adding or calling a 20 "twice" a 10.
- Quoting a quantitative result as one exact number instead of a range with its basis.
- Adding P90 values across risks: a bad year for several risks is not the sum of their P90s; only the means add up.
- Letting a money estimate lower an SL-T or a risk level.
- Quantifying everything: the effort belongs on the few risks that need a money decision.
- Ignoring safety: in OT, the worst consequence is often harm to people or the environment, which money alone does not capture.
7. How CYNAPSE RABUILD does it
RABUILD runs the IEC 62443-3-2 assessment semi-quantitatively: likelihood and impact on 1-5 scales, the five-level scale Minor ... Critical, the declared tolerable risk Rt, CRRF and the SL-T of every zone and conduit. Detailed risks can be threat scenarios or asset risks; Cyber-PHA, business impact and vulnerability findings feed into them.
For the risks that need a money answer, Risk Overview > Loss exposure adds the quantitative view. The asset owner sets the project's loss values once (the cost of an hour of lost operation, outage hours and response cost per impact level, secondary loss, and loss events per year per likelihood level). Each estimate is pre-filled from the risk's rating, adjusted by the analyst with its basis, and simulated 10,000 times in the FAIR-style Loss exposure register: ALE and P90 today and after treatment, the loss avoided and the return on control cost, per risk and per System. The money view never changes a risk level, CRRF or SL-T.
Further reading
- ISO 31000:2018 and IEC 31010:2019, risk management and assessment techniques.
- ISO/IEC 27005:2022, information security risk management.
- NIST SP 800-30 Rev. 1, Guide for Conducting Risk Assessments; NIST IR 8286, integrating cybersecurity and enterprise risk management.
- IEC 62443-3-2, security risk assessment for system design.
- ISA TR84.00.09, cybersecurity related to the functional safety lifecycle (Cyber-PHA).
- The Open Group, Open FAIR Risk Taxonomy (O-RT) and Risk Analysis (O-RA).
- L. A. Cox, "What's Wrong with Risk Matrices?", Risk Analysis, 2008.
- D. Hubbard and R. Seiersen, How to Measure Anything in Cybersecurity Risk.